For Contractors
Field notes, tools and support for the contractors who apply Tnemec coatings. The Wet Edge lessons below cover the steps that decide whether a job passes inspection and holds up: film thickness, dew point, profile, pot life, recoat windows, concrete moisture and holiday testing. Each one ends with a bottom line your crew can use on the next job.
Question on a job? Call 484-644-5303 or email atlantic@tnemec.com.
1
Coating Takeoff Calculator
Measure the surfaces, pick the Tnemec system and get gallons per coat with a loss allowance. Coverage figures come from each product's published data sheet, so the takeoff starts from the same numbers the spec does. Use the Open the Takeoff Calculator button on this page.
2
The Wet Edge Field Notes
Short lessons for foremen, applicators and estimators. Each one covers one topic, one practical move and one bottom line, with the standard or data sheet behind it. Start with the list below; new lessons are added as they are published.
3
Product Recommendations
Not sure which Tnemec system fits the substrate, the exposure or the schedule? We help contractors choose products, read the data sheets and sort out substitution questions before the bid, so the system you price is the system the spec calls for.
4
Field Support and Crew Training
We attend pre-job meetings, visit the site during application and train crews on surface prep, mixing, application and inspection. When something looks wrong on the job, call us before you coat over it. As an independent Tnemec representative, we can also connect you with technical resources at the manufacturer.

The Wet Edge: Field Notes for Coating Crews
Field Quick Reference
Wet film target. WFT = DFT ÷ volume solids. If you thin, multiply by 1 plus the thinner percentage. A 5-mil DFT spec with a 67%-solids epoxy needs about 7.5 mils wet, or about 8.2 thinned 10%. (ASTM D4414)
Theoretical coverage. 1,604 × volume solids ÷ DFT = square feet per gallon before losses. Tnemec Series 66 at 56% solids and 4 mils DFT works out to about 225 sq ft per gallon. Apply a loss factor from your own jobs.
Dew point. Keep the steel at least 5°F above the dew point through prep, application and cure. Read the coldest steel, not the air. If the data sheet asks for more, the data sheet wins. (ASTM D3276)
Concrete moisture. Common limits are 3 lbs per 1,000 sq ft in 24 hours (ASTM F1869) or 75 to 80% RH (ASTM F2170). Give new concrete its 28-day cure. The product data sheet sets the limit.
Holiday testing. Under 20 mils, low-voltage wet sponge at 67.5 or 90 volts. Thicker linings, high-voltage spark set by film thickness. Test after cure and before service. (NACE SP0188)
Recoat windows. Check the minimum and the maximum. Past the maximum, abrade per the data sheet before the next coat.
These are field rules of thumb. The current product data sheet and the project specification always govern.

Questions on a Job?
Tell us what you are coating and what the spec calls for, and a consultant will follow up. Call 484-644-5303, email atlantic@tnemec.com, or use the contact form.