This is ACC's guide specification for resinous flooring: epoxy broadcast, water-based epoxy, urethane cement and reinforced waterproof deck systems, written in CSI 3-part format with Tnemec Company as the basis of design. The full text is below. Edit it to suit your project, or ask us to tailor it for you.

Questions: atlantic@tnemec.com or 484-644-5303.


SECTION 09 67 23 — RESINOUS FLOORING

Guide Specification — Epoxy Broadcast, Water-Based Epoxy, Urethane Cement and Reinforced Waterproof Deck Systems

Specifier Note: This guide specification is provided as a technical resource by Atlantic Coating Consultants (ACC), an independent representative for Tnemec, TEX-COTE and Epoxytec, and is compiled from ACC's standard Tnemec coating systems. It is a template for resinous flooring on any project type and is not a project-specific specification. This Section covers floor systems only; wall, ceiling and other non-floor coating systems are in Section 09 96 00. System codes are ACC's standard system codes. Select the system(s) appropriate to the project, add typical locations for that building type, and delete the remainder along with all Specifier Notes. VERIFY ALL PRODUCT DESIGNATIONS, COATS, THICKNESSES AND SURFACE PREPARATION / MOISTURE TESTING REQUIREMENTS WITH ATLANTIC COATING CONSULTANTS OR TNEMEC COMPANY BEFORE ISSUING FOR BID OR CONSTRUCTION. Contact: Wally Bates, Atlantic Coating Consultants — atlantic@tnemec.com — 484-644-5303.

This product selection guide is written according to the Construction Specifications Institute (CSI) Format, including MasterFormat, SectionFormat, and PageFormat, contained in the CSI Manual of Practice. This specification is only a guide listing various resinous flooring system options and should not be used as a final specification. Tnemec Company, Inc. is not liable in any way for revisions to, or use of, this product guide specification by any end user. A qualified design professional should review and edit this document to suit project requirements and coordinate this Section with other specification sections and the drawings.

This Section is based on the products of Tnemec Company, Inc., 123 West 23rd Ave, North Kansas City, MO 64116, (816) 483-3400, www.tnemec.com. This Section uses the term "Architect"; change this term throughout to match the term used to identify the design professional as defined in the General and Supplementary Conditions.

Specifier Note: System selection guide: 100% solids epoxy (E1) for standard occupied-building floors; water-based epoxy (WB1) where low odor during application is required in occupied buildings; urethane cement (UC1) for heavy duty, thermal shock, washdown and elevated moisture-vapor slabs; reinforced waterproof deck (WP1) for elevated or exterior pedestrian decks over occupied space. Gymnasium and athletic wood floors are not resinous scope.

PART 1 — GENERAL

1.1 SUMMARY

    A. This Section includes the surface preparation and application requirements of high-performance resinous floor coating systems, installed by a manufacturer-approved Applicator, on the following general system types:

        1. 100% Solids Epoxy Systems — clear sealer, thin-film solid color, and 1/16-inch and 1/8-inch broadcast systems.

        2. Water-Based Epoxy Systems — low-odor alternates for occupied buildings.

        3. Urethane Cement Systems — 1/8-inch and 1/4-inch nominal thickness, including systems formulated for slabs with elevated moisture vapor transmission.

        4. Reinforced Waterproof Deck Coating — fluid-applied waterproofing membrane for elevated or exterior pedestrian decks.

    B. Coordination:

        1. Coordinate surface preparation of substrates to avoid later difficulty or delay in performing the Work of this Section.

        2. Review installation procedures under other Sections and coordinate installation of items that must be in place prior to application of the resinous floor coating systems.

        3. Substrate surface preparation and resinous floor coating application, including identified crack and joint repair, shall be completed by the manufacturer's approved Applicator.

        4. The Applicator shall coordinate with Architect and Owner regarding availability of work areas, completion times, safety, access, and other factors that could affect building operations.

    C. Related Sections:

        1. Section 03 30 00 — Cast-in-Place Concrete.

        2. Section 07 92 00 — Joint Sealants.

        3. Section 09 96 00 — High-Performance Coatings, for wall, ceiling, and other non-floor coating systems.

Specifier Note: Select and retain only the system(s) required for the project from Article 3.9, Coating System Schedule, and delete the rest.

1.2 REFERENCES

    A. This Section contains references to the governing standards and documents listed below. They are a part of this Section as specified and modified; the current version shall apply unless otherwise noted. In case of conflict between the requirements of this Section and those of the listed documents, the more stringent requirement shall prevail.

    B. American Concrete Institute (ACI):

        1. ACI 301 — Specifications for Structural Concrete.

        2. ACI 308R — Guide to Curing Concrete.

    C. ASTM International (ASTM):

        1. ASTM D4263 — Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method.

        2. ASTM D4414 — Standard Practice for Measurement of Wet Film Thickness by Notch Gages.

        3. ASTM F1869 — Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride.

        4. ASTM F2170 — Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In Situ Probes.

    D. International Concrete Repair Institute (ICRI):

        1. ICRI Guideline No. 310.2R — Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays; Concrete Surface Profile (CSP) chip/grade scale.

    E. AMPP (formerly NACE International and SSPC):

        1. NACE No. 6 / SSPC-SP13 — Surface Preparation of Concrete.

    F. Unless otherwise specified, references to documents shall mean the documents in effect at the time of receipt of Bids. If a referenced document has been discontinued, the reference shall mean the last version before discontinuation, or its designated replacement.

1.3 SUBMITTALS

    A. Submit under provisions of Division 01.

    B. Product Data Sheets: Current technical data for each component specified and applied under this Section.

    C. Safety Data Sheets (SDS): Current SDS for all materials brought on site, including clean-up solvents and repair or resurfacing mortars and linings.

    D. Installation Instructions: Manufacturer's written installation instructions for the materials specified.

    E. Qualification Data: Submit proof of the Applicator's acceptability to the manufacturer, to Architect.

    F. Construction Details: Copies of the manufacturer's standard flooring details (terminations, transitions, joints, coving).

    G. Jobsite Layout Plan: Including material storage/staging and equipment storage/staging.

    H. Samples: For each resinous floor coating system specified, submit a 3-inch x 6-inch sample representative of color, texture, and thickness.

    I. Jobsite Reports: Submit at completion of the Work.

        1. Daily Reports: Surface preparation, substrate temperature, ambient air temperature, application procedures, materials applied, material quantities, material batch numbers, and description and location of work completed.

        2. The Applicator shall maintain a copy of records until expiration of the specified warranty period.

1.4 QUALITY ASSURANCE

    A. Applicator Qualifications:

        1. Applicator shall be qualified by the manufacturer prior to the bid date.

        2. Installation equipment shall be acceptable to the manufacturer.

        3. Applicator shall establish quality control procedures and practices to monitor surface preparation, storage, mixing, application, and inspection throughout the project.

        4. Applicator shall provide a full-time, on-site person whose dedicated responsibility is quality control of the application.

        5. Applicator's quality control procedures shall include training of personnel in proper surface preparation, storing, mixing, application, and quality control testing.

    B. Mock-Ups:

        1. Apply a full-thickness mock-up of each system on a 48-inch square floor area selected by Architect, to verify selections made under sample submittals and set quality standards for materials and workmanship.

        2. Simulate finished lighting conditions for Architect's review of mock-ups.

        3. Use the mock-up to confirm an acceptable level of slip resistance with the Owner/Architect.

        4. Approved mock-ups may become part of the completed Work if undisturbed at Substantial Completion.

    C. Pre-Installation Conference:

        1. Before installing mock-ups, General Contractor, Applicator, and a technical representative of the manufacturer shall meet on-site with Architect to discuss approved products, workmanship, application, and substrate preparation requirements.

        2. Topics to be reviewed shall include: Contract Documents and required submittals; status of substrate work and surface preparation approval; on-site quality control inspection and testing requirements; quality control reporting requirements; availability of materials, tradesmen, equipment, and facilities; material and equipment storage and staging; waste management and disposal; environmental and other project conditions; code compliance, environmental protection, health, safety, and fire considerations; and protection of completed Work.

    D. Single-Source Responsibility: Materials shall be products of a single manufacturer, or items standard with and specifically recommended by that manufacturer, to ensure compatibility of the system.

    E. Regulatory Requirements: Conform to applicable codes and ordinances for flame, fuel, smoke, and volatile organic compound (VOC) rating requirements in effect at the time of application.

1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING

    A. Delivery: Deliver material in the manufacturer's original, unopened, undamaged packages, clearly identifying manufacturer, brand name, contents, color, batch number, and safety hazards. Packages showing damage that may affect the condition of the contents are not acceptable.

    B. Storage: Store materials per the manufacturer's recommendations, in enclosed structures, protected from weather and adverse temperature; store flammable materials per state and local codes; remove materials exceeding shelf life promptly from the site; store only in areas designated by Architect for this purpose.

    C. Handling: Handle materials to prevent damage to products or finishes.

1.6 JOB CONDITIONS

    A. Environmental Requirements:

        1. Proceed with the Work only when substrate temperature and moisture conditions, air temperature, relative humidity, dew point, and other conditions comply with the manufacturer's written recommendations, and when no damaging environmental conditions are forecast for the period the material will be vulnerable. Record conditions in the daily quality control report.

        2. Maintain substrate and ambient air temperature before, during, and after installation above 55 degrees F and rising, in accordance with manufacturer's instructions, unless the product data for the system selected requires otherwise.

        3. Provide adequate ventilation during installation and full curing of the Work.

        4. Do not apply coatings when ambient air temperature is within 5 degrees F of the dew point and falling.

    B. Moisture Requirements:

        1. Test concrete moisture vapor emission rate and/or relative humidity in accordance with ASTM F1869 and/or ASTM F2170, as applicable, prior to selecting and installing a resinous flooring system. Confirm the presence or absence of a vapor barrier below the slab.

        2. Compare test results to the moisture limits published in the manufacturer's current product data sheet for each component of the system selected; do not proceed where results exceed those limits without the manufacturer's written concurrence.

        3. Where test results exceed the limits for a standard (non-MVT) system, select a moisture-vapor-tolerant (MVT) primer (Series 208 Epoxoprime MVT), base coat (Series N241 Ultra-Tread MVT or Series N242 Ultra-Tread S), or complete system as scheduled in Article 3.9, or consult Tnemec Technical Services for a project-specific recommendation.

    C. Dust and Contaminants: Protect the Work and adjacent areas from excessive dust and airborne contaminants during application and curing; schedule the Work to minimize dust and airborne contaminants.

    D. Lighting: Provide permanent lighting during application, or simulate permanent lighting conditions if not yet in place.

    E. Close the area to traffic during application and for not less than 24 hours after application, unless the manufacturer recommends a longer period.

1.7 WARRANTY

Specifier Note: If the project requires a material and/or workmanship warranty, retain this Article; otherwise delete.

    A. Submit the manufacturer's standard warranty for material.

    B. Submit the Applicator's standard warranty for workmanship.

PART 2 — PRODUCTS

2.1 BASIS OF DESIGN MANUFACTURER

    A. Products specified are manufactured by Tnemec Company, Inc., 123 West 23rd Ave, North Kansas City, MO 64116, (816) 483-3400, www.tnemec.com, and are specified as a standard of quality/performance and basis of design. The specified basis of design is intended to provide the longest service life, lowest life cycle cost, and most sustainable solution.

    B. Contact: Wally Bates, Atlantic Coating Consultants — atlantic@tnemec.com — 484-644-5303.

    C. Materials specified herein shall not preclude consideration of equivalent or superior materials. Submitted equivalent materials or other substitutions shall be submitted to the specifier for consideration in compliance with substitution procedures in Division 01 of the Project Manual and include the following:

        1. Requests for substitution shall be provided no later than fourteen (14) days prior to the published bid opening date and must include all required data as listed in these specifications. Substitution requests with incomplete data shall not be reviewed.

        2. Requests for substitution shall be made by a plan-holding, licensed, prospective bidder on the project.

        3. Requests for substitution shall include actual case histories as evidence of satisfactory past performance in a similar environment with similar estimated service life of the system specified.

        4. Substitutions will not be considered that change the generic type or number of coats, or do not meet specified dry film thicknesses.

        5. Requests for substitution shall include manufacturer's certified test reports showing the substitute product's full list of performance data for comparison.

        6. After the second submittal, Architect/Owner or Owner's Agent hourly rates will be charged to review further submittals.

    D. Bidders desiring to use coatings other than those specified shall submit those with their proposal based on the specified materials, and indicate the sum which will be added to or deducted from the base bid should alternate materials be accepted.

2.2 GENERAL

    A. VOC Content: Products shall comply with the VOC limits of authorities having jurisdiction for the project location.

    B. Provide primers, base/broadcast coats, grout coats, and finish coats that are products of a single manufacturer and are compatible with one another and with the substrate, as demonstrated by the manufacturer based on testing and field experience.

2.3 COATING SYSTEM MATERIALS

Specifier Note: Component products vary by system and are scheduled in Article 3.9, Coating System Schedule. Retain the paragraph below only if a single system has been selected for the entire project; otherwise delete it and rely on the Schedule.

    A. Provide the primer, base coat, broadcast aggregate, grout coat, and finish coat products scheduled in Article 3.9, Coating System Schedule, for each resinous floor coating system indicated on the Drawings or in the Room Finish Schedule.

2.4 ACCESSORY MATERIALS

    A. Patching and Fill Material: Resinous product of, or approved by, the coating manufacturer and recommended for the application indicated.

    B. Joint Sealant: Type recommended or produced by the coating manufacturer for the type of service and joint condition indicated; comply with Section 07 92 00, Joint Sealants, where applicable.

    C. Coving: Series N283 coving resin, or Series N222 or 288 epoxy blended with aggregate as scheduled, formed to a cant or rolled-radius profile at wall and vertical surface interfaces, unless integral coving is scheduled for the system.

    D. Broadcast Aggregate: 30/50 mesh silica sand, Series 222C ChromaQuartz decorative quartz, or Series 224C decorative vinyl flake as scheduled for each system, of the mesh size and broadcast rate indicated.

    E. Colorants: Manufacturer's standard field colorants (Series 820 / 821) for grout and finish coats, as scheduled.

PART 3 — EXECUTION

3.1 PROTECTION

    A. The Applicator shall cover or otherwise protect finish work and other surfaces not being coated under this Section. Erect and maintain protective tarps, enclosures, and/or masking to contain debris, dust, and other airborne particles generated by surface preparation or application, including dust or debris collection apparatus as required, at no additional cost to Owner.

3.2 EXAMINATION

    A. Site Verification of Conditions:

        1. Examine the areas and conditions under which the resinous floor coating Work is to be performed in accordance with SSPC-SP13/NACE No. 6, and notify Architect in writing of conditions detrimental to proper and timely completion of the Work.

        2. Verify concrete has cured a minimum of 28 days at 75 degrees F using the procedures described in ACI 308R, or as otherwise indicated by the concrete Section of this Project Manual.

        3. Confirm the presence or absence of a vapor barrier below the slab, and proceed in accordance with Article 1.6, Job Conditions, Moisture Requirements.

    B. Commencement of the Work of this Section indicates that the substrate and other conditions of installation are acceptable to the Contractor and Applicator, and will produce a finished product meeting the requirements of the Specifications. Defects resulting from accepted conditions shall be corrected by the Applicator at no additional cost to Owner.

3.3 SURFACE PREPARATION

    A. Concrete Floors:

        1. Remove all existing coatings not scheduled to remain.

        2. Ensure surfaces are clean, dry, and free of oil, grease, and other contaminants prior to preparation in accordance with NACE No. 6/SSPC-SP13. Concrete surfaces must be sound and capable of supporting the resinous floor coating system.

        3. Mechanically abrade concrete surfaces to remove laitance, curing compounds, hardeners, sealers, existing coatings, and other contaminants, and to provide a uniform Concrete Surface Profile (CSP) in accordance with NACE No. 6/SSPC-SP13 and ICRI Guideline No. 310.2R.

        4. Fill cracks, voids, and other surface imperfections with the manufacturer's recommended filler or surfacer prior to installation of the flooring system. Treat control joints and other nonmoving substrate cracks to prevent reflective cracking through the resinous floor coating system, in accordance with the manufacturer's written recommendations.

Specifier Note: The required CSP profile varies by system — see Article 3.9, Coating System Schedule, for the CSP profile specified for each system selected.

3.4 APPLICATION

    A. General: Apply components of each resinous floor system in accordance with the manufacturer's written instructions to produce a uniform, monolithic wearing surface of the thickness indicated in the Coating System Schedule.

    B. Coordinate application of components to provide optimum adhesion of the flooring system to the substrate and optimum intercoat adhesion.

    C. Cure resinous flooring components in accordance with the manufacturer's written instructions; prevent contamination during application and curing.

    D. At substrate expansion and isolation joints, provide a joint in the resinous flooring system in accordance with the manufacturer's written recommendations, including application of joint sealant.

    E. Install terminations in accordance with the Tnemec StrataShield Standard Flooring Details Guide, or equivalent current manufacturer detail guide.

    F. Mask or otherwise protect areas not scheduled to receive the resinous floor coating system.

    G. Surface Temperature: Prior to application, surface temperature shall comply with the manufacturer's written recommendations for the system selected.

    H. Material Temperature: Prior to application, material temperature shall comply with the manufacturer's written recommendations, or shall be between 65 degrees F and 85 degrees F; store material at these temperatures a minimum of 48 hours prior to use.

    I. Apply each material at not less than the manufacturer's recommended spreading rate; provide total cured thickness as indicated in the Coating System Schedule or as recommended in writing by the manufacturer.

3.5 FIELD QUALITY CONTROL, INSPECTION, AND TESTING

    A. The Applicator shall perform the quality control procedures below in conjunction with the requirements of this Section.

    B. Inspect materials upon receipt to confirm they are supplied by the approved manufacturer.

    C. Surface Profile: Inspect and record substrate profile (anchor pattern). Surfaces shall be profiled to the CSP amplitude scheduled for the system, in accordance with ICRI Guideline No. 310.2R and SSPC-SP13/NACE No. 6. Compare and record substrate profile once every 50 square feet using CSP comparators.

    D. Surface Cleanliness: Inspect prepared concrete surfaces for cleanliness after cleaning and drying, prior to resurfacing or coating application.

    E. Concrete Moisture Testing:

        1. After surface preparation, verify concrete dryness in accordance with ICRI Guideline No. 310.2R and SSPC-SP13/NACE No. 6, using ASTM F1869 (moisture vapor emission rate) and/or ASTM F2170 (in situ relative humidity), as applicable to the system selected.

        2. Moisture limits shall be in accordance with the manufacturer's written recommendations for the specified system; where results are elevated, refer to Article 1.6, Job Conditions, Moisture Requirements, and the MVT system notes in Article 3.9.

        3. Consult the manufacturer regarding questions or recommendations related to moisture problems before proceeding.

    F. Measure and record ambient air temperature, relative humidity, and dew point once every two hours of each work shift, and substrate temperature once every two hours using an infrared or other surface thermometer.

    G. Dry-film thickness shall be determined using a surface-area coverage calculation for material consumption, per system as scheduled.

    H. The Applicator is responsible for keeping Architect informed of progress so Architect may provide additional quality control oversight at its discretion; inspection by Architect or others does not relieve the Applicator of responsibility for quality control inspection and testing specified herein or required by the manufacturer.

    I. Material Sampling: Owner may, at any time and any number of times during application, require material samples for compliance testing. Owner will engage an independent testing agency to sample, identify, seal, and certify materials in the presence of Contractor. If test results show noncompliance, the Contractor shall pay for testing, remove noncomplying materials, prepare affected surfaces, and reapply flooring materials to comply with requirements.

3.6 MANUFACTURER'S FIELD SERVICES

    A. The manufacturer's technical representative shall provide technical assistance and guidance for surface preparation and application of the coating systems.

3.7 ACCEPTANCE CRITERIA

    A. The finished surface shall be uniform in texture and color, free of pinholes, voids, fisheyes, blisters, or delamination.

3.8 CLEANING AND PROTECTING

    A. Protect the completed Work from traffic, physical abuse, liquids, and chemical exposure until the complete system has cured a minimum of 24 hours, or longer if recommended by the manufacturer.

    B. At completion of the Work, remove materials and debris associated with this Section.

    C. Clean surfaces not designated to receive the resinous floor coating system; restore affected areas in a manner acceptable to Architect.

    D. Protect the completed Work from damage until Final Acceptance. Repair or replace resinous floor coating systems damaged in any manner, at Architect's discretion, at no additional cost to Owner.

3.9 COATING SYSTEM SCHEDULE

Specifier Note: Systems below are grouped by generic system type and identified by ACC's standard system codes. Retain only the system(s) required for the project and delete the remainder; add a bracketed list of typical locations for the project type after each system heading. Where the project includes areas with elevated moisture vapor transmission, select an MVT option per the moisture test results required in Article 1.6. Coverage rates are in square feet per gallon unless noted.

    A. 100% Solids Epoxy Systems (E1)

        1. Clear Sealer (System E1.1)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 3 minimum.

            b. Primer: Series N222 Deco-Tread (clear), 160-200 SF/gal.

            c. Finish: Series N222 Deco-Tread (clear), 160-200 SF/gal.

            d. Total Thickness: Applied at coverage rate — see coat schedule.

Note: Use Series 248 Everthane as a finish coat for added wear resistance

Note: Series 208 can be used as a primer for elevated MVT in the concrete

        2. Thin Film Solid Color (System E1.2)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 3 minimum.

            b. Primer: Series 201 Epoxoprime (clear), 250-320 SF/gal.

            c. Intermediate: Series N222 Deco-Tread (pigmented), 160-200 SF/gal.

            d. Finish: Series N222 Deco-Tread (pigmented), 160-200 SF/gal.

            e. Total Thickness: Applied at coverage rate — see coat schedule.

Note: Use Series 248 Everthane as a finish coat for added wear resistance

Note: Series 208 can be used as a primer for elevated MVT in the concrete

        3. 1/16" Solid Color Epoxy Broadcast — Light Duty (System E1.3)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series N222 Deco-Tread, 250-320 SF/gal.

            d. Broadcast Coat: Series N222 Deco-Tread with 30/50 silica sand, 80-100 SF/gal.

            e. Grout Coat: Series N222 Deco-Tread (pigmented), 160-200 SF/gal.

            f. Finish Coat: Series 248 Everthane with 821 Field Colorant, 500-600 SF/gal.

            g. Total Thickness: Nominal 1/16" system.

        4. 1/8" Solid Color Epoxy Broadcast — Moderate Duty (System E1.4)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series N222 Deco-Tread, 250-320 SF/gal.

            d. First Broadcast Coat: Series N222 Deco-Tread with 30/50 silica sand, 80-100 SF/gal.

            e. Second Broadcast Coat: Series N222 Deco-Tread with 30/50 silica sand, 80-100 SF/gal.

            f. Grout Coat: Series N222 Deco-Tread (pigmented), 160-200 SF/gal.

            g. Finish Coat: Series 248 Everthane with 821 Field Colorant, 500-600 SF/gal.

            h. Total Thickness: Nominal 1/8" system.

        5. 1/8" Decorative Quartz Epoxy Broadcast — Moderate Duty (System E1.5)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series N222 Deco-Tread, 250-320 SF/gal.

            d. First Broadcast Coat: Series N222 Deco-Tread (clear) with decorative quartz, 80-100 SF/gal.

            e. Second Broadcast Coat: Series N222 Deco-Tread (clear) with decorative quartz, 80-100 SF/gal.

            f. Grout Coat: Series N222 Deco-Tread (clear), 160-200 SF/gal.

            g. Finish Coat: Series 248 Everthane (clear), 500-600 SF/gal.

            h. Total Thickness: Nominal 1/8" system.

        6. 1/16" Decorative Flake Epoxy Broadcast — Light/Moderate Duty (System E1.6)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series N222 Deco-Tread, 250-320 SF/gal.

            d. Base Coat: Series N222 Deco-Tread with decorative flake, 160-180 SF/gal.

            e. Grout Coat 1: Series N222 Deco-Tread (clear) with decorative flake, 160-180 SF/gal.

            f. Grout Coat 2: Series N222 Deco-Tread (clear), 160-200 SF/gal.

            g. Finish Coat: Series 248 Everthane, 500-600 SF/gal.

            h. Total Thickness: Nominal 1/16" system (includes broadcast flake).

    B. Water-Based Epoxy (WB1)

        1. Clear Sealer (System WB1.1)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 2-3 minimum.

            b. Primer: Series 288 Enviro-Pox (clear), 200-250 SF/gal.

            c. Finish: Series 289 Enviro-Pox (clear), 200-250 SF/gal.

            d. Total Thickness: Applied at coverage rate — see coat schedule.

Note: Use Series 248 Everthane as a finish coat for added wear resistance

        2. Thin Film Solid Color (System WB1.2)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 2-3 minimum.

            b. Primer: Series 288 Enviro-Pox, 250-320 SF/gal.

            c. Intermediate: Series 289 Enviro-Pox (pigmented), 160-200 SF/gal.

            d. Finish: Series 289 Enviro-Pox (pigmented), 160-200 SF/gal.

            e. Total Thickness: Applied at coverage rate — see coat schedule.

Note: Use Series 248 Everthane as a finish coat for added wear resistance

        3. 1/16" Solid Color Epoxy Broadcast — Light Duty (System WB1.3)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 2-3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series 288 Enviro-Pox, 250-320 SF/gal.

            d. Broadcast Coat: Series 288 Enviro-Pox with 30/50 silica sand, 80-100 SF/gal.

            e. Grout Coat: Series 288 Enviro-Pox (pigmented), 160-200 SF/gal.

            f. Finish Coat: Series 248 Everthane with 821 Field Colorant, 500-600 SF/gal.

            g. Total Thickness: Nominal 1/16" system.

        4. 1/8" Solid Color Epoxy Broadcast — Moderate Duty (System WB1.4)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 2-3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series 288 Enviro-Pox, 250-320 SF/gal.

            d. First Broadcast Coat: Series 288 Enviro-Pox with 30/50 silica sand, 80-100 SF/gal.

            e. Second Broadcast Coat: Series 288 Enviro-Pox with 30/50 silica sand, 80-100 SF/gal.

            f. Grout Coat: Series 288 Enviro-Pox (pigmented), 160-200 SF/gal.

            g. Finish Coat: Series 248 Everthane with 821 Field Colorant, 500-600 SF/gal.

            h. Total Thickness: Nominal 1/8" system.

        5. 1/8" Decorative Quartz Epoxy Broadcast — Moderate Duty (System WB1.5)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 2-3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series 288 Enviro-Pox, 250-320 SF/gal.

            d. First Broadcast Coat: Series 288 Enviro-Pox (clear) with decorative quartz, 80-100 SF/gal.

            e. Second Broadcast Coat: Series 288 Enviro-Pox (clear) with decorative quartz, 80-100 SF/gal.

            f. Grout Coat: Series 288 Enviro-Pox (clear), 160-200 SF/gal.

            g. Finish Coat: Series 248 Everthane (clear), 500-600 SF/gal.

            h. Total Thickness: Nominal 1/8" system.

        6. 1/16" Decorative Flake Epoxy Broadcast — Light/Moderate Duty (System WB1.6)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 2-3 minimum.

            b. Cove Base (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Primer: Series 288 Enviro-Pox, 250-320 SF/gal.

            d. Base Coat: Series 288 Enviro-Pox with decorative flake, 160-180 SF/gal.

            e. Grout Coat 1: Series 288 Enviro-Pox (clear) with decorative flake, 160-180 SF/gal.

            f. Grout Coat 2: Series 288 Enviro-Pox (clear), 160-200 SF/gal.

            g. Finish Coat: Series 248 Everthane, 500-600 SF/gal.

            h. Total Thickness: Nominal 1/16" system (includes broadcast flake).

    C. Urethane Cement Systems (UC1)

        1. 1/4" Solid Color Urethane Cement — Heavy Duty (System UC1.1)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 5 minimum.

            b. Base / Broadcast Coat: Series N242 Ultra-Tread S with 30/50 aggregate, 37 SF/kit.

            c. Coving (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            d. Grout Coat: Series N222 Deco-Tread (pigmented), 160-200 SF/gal.

            e. Finish Coat: Series 248 Everthane with 821 Field Colorant, 500-600 SF/gal.

            f. Total Thickness: Nominal 1/4" system.

        2. 1/4" Decorative Quartz Urethane Cement — Heavy Duty (System UC1.2)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 5 minimum.

            b. Coving (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Base / Broadcast Coat: Series N242 Ultra-Tread S with decorative quartz, 37 SF/kit.

            d. Second Broadcast: Series N222 Deco-Tread (clear) with decorative quartz, 80-100 SF/gal.

            e. Grout Coat: Series N222 Deco-Tread (clear), 160-200 SF/gal.

            f. Finish Coat: Series 248 Everthane (clear), 500-600 SF/gal.

            g. Total Thickness: Nominal 1/4" system.

        3. 1/8" Solid Color Urethane Cement — Moderate/Heavy Duty (System UC1.3)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 5 minimum.

            b. Coving (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Base / Broadcast Coat: Series N241 Ultra-Tread MVT with aggregate, 90 SF/kit.

            d. Grout Coat: Series N222 Deco-Tread (pigmented), 160-200 SF/gal.

            e. Finish Coat: Series 248 Everthane with 821 Field Colorant, 500-600 SF/gal.

            f. Total Thickness: Nominal 1/8" system.

        4. 1/8" Decorative Quartz Urethane Cement — Moderate/Heavy Duty (System UC1.4)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 5 minimum.

            b. Coving (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Base / Broadcast Coat: Series N241 Ultra-Tread MVT with decorative quartz, 90 SF/kit.

            d. Second Broadcast: Series N222 Deco-Tread (clear) with decorative quartz, 80-100 SF/gal.

            e. Grout Coat: Series N222 Deco-Tread (clear), 160-200 SF/gal.

            f. Finish Coat: Series 248 Everthane (clear), 500-600 SF/gal.

            g. Total Thickness: Nominal 1/8" system.

        5. 1/8" Decorative Flake Urethane Cement — Moderate/Heavy Duty (System UC1.5)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to ICRI-CSP 5 minimum.

            b. Coving (where required): Series N283, N222 or 288 epoxy with aggregate, Applied at coverage rate.

            c. Base / Broadcast Coat: Series N241 Ultra-Tread MVT with decorative flake, 90 SF/kit.

            d. Second Broadcast: Series N222 Deco-Tread (clear) with decorative flake, 80-100 SF/gal.

            e. Grout Coat: Series N222 Deco-Tread (clear), 160-200 SF/gal.

            f. Finish Coat: Series 248 Everthane (clear), 500-600 SF/gal.

            g. Total Thickness: Nominal 1/8" system.

    D. Reinforced Waterproof Deck Coating (WP1)

        1. Elevated / Exterior Pedestrian Deck — Heavy Duty (System WP1.1)

            a. Surface Preparation: NACE No. 6/SSPC-SP13, shot-blast or mechanically abrade to the ICRI-CSP profile scheduled.

            b. Integral Coving: 4" cove base at vertical interfaces, SF / gal.

            c. Primer: Series 154 TnemeGuard (thinned), DFT 4.0 - 7.0 mils.

            d. Intermediate: Series 154 TnemeGuard with fiberglass mesh over seams, DFT 10.0 - 14.0 mils.

            e. Saturant / Broadcast: Series 154 TnemeGuard with decorative flake, DFT 10.0 - 14.0 mils.

            f. Build Coat: Series 154 TnemeGuard, DFT 10.0 - 14.0 mils.

            g. Finish Coat: Series 248 Everthane, 500-600 SF/gal.

            h. Total DFT: ~36.5-52 mils DFT (sum of primer through finish, excluding embedded flake).

Specifier Note: Specify the Color Schedule here or on the Drawings. Delete this note if not required.

End of Section 09 67 23

Recent Posts

See All

Comments


  • Grey Twitter Icon
  • Grey LinkedIn Icon
  • Grey Facebook Icon

© 2026 Atlantic Coating Consultants · 108 Oak Creek Dr., Royersford, PA 19468 · 484-644-5303

bottom of page