SECTION 09 96 00 — HIGH-PERFORMANCE COATINGS
Architectural Guide Specification — Interior and Exterior Coating Systems
Specifier Note: This guide specification is provided as a technical resource by Atlantic Coating Consultants (ACC), an independent representative for Tnemec, TEX-COTE and Epoxytec, and is compiled from ACC's standard Tnemec coating systems. It is a template for architectural projects of any type — schools and universities, police and fire stations, jails and courthouses, municipal buildings, airports, museums, hospitals, offices, warehouses and similar facilities — and is not a project-specific specification. Systems in the Coating System Schedule are organized by substrate, condition and duty level; each is cross-referenced to its ACC system code. Select the systems appropriate to the project type and scope, add typical locations for that building type, and delete the remainder. Delete all Specifier Notes before issuing. VERIFY ALL PRODUCT DESIGNATIONS, COATS, DRY FILM THICKNESSES AND SURFACE PREPARATION REQUIREMENTS WITH ATLANTIC COATING CONSULTANTS OR TNEMEC COMPANY BEFORE ISSUING FOR BID OR CONSTRUCTION. Contact: Wally Bates, Atlantic Coating Consultants — atlantic@tnemec.com — 484-644-5303.
This product selection guide is written according to the Construction Specifications Institute (CSI) Format, including MasterFormat, SectionFormat, and PageFormat, contained in the CSI Manual of Practice. This specification is only a guide listing various coating system options and should not be used as a final specification. Tnemec Company, Inc. is not liable in any way for revisions to, or use of, this product guide specification by any end user. A qualified design professional should review and edit this document to suit project requirements and coordinate this Section with other specification sections and the drawings.
This Section is based on the products of Tnemec Company, Inc., 123 West 23rd Ave, North Kansas City, MO 64116, www.tnemec.com. This Section uses the term "Architect"; change this term throughout to match the term used to identify the design professional as defined in the General and Supplementary Conditions.
Specifier Note: Scope selection: for new construction, retain the "New / Uncoated" groups (C1, C2, S1, EC1, ES1, ES3.1-3.2); for maintenance and repaint work, retain the "Existing / Previously Coated" groups (C3, S2, EC2, ES2, ES3.3) and offer full-removal systems as separate alternates. Resinous flooring is specified in Section 09 67 23; wastewater and potable-water immersion service in Sections 09 96 23 and 09 96 24.
PART 1 — GENERAL
1.1 RELATED DOCUMENTS
A. This Section includes shop and field surface preparation and application of high-performance coating systems on the substrates scheduled at the end of this Section.
B. Drawings and General Provisions of the Contract, including the General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
C. Related Sections include the following:
1. Division 03 — Concrete, and Division 04 — Masonry, for substrate construction and curing.
2. Division 05 Sections, for shop priming of metal substrates with primers specified in this Section.
3. Section 09 67 23 — Resinous Flooring, for interior floor coating systems.
4. Section 09 91 00 — Painting, for general field painting not scheduled herein.
5. Section 09 96 23 — High-Performance Coatings for Wastewater Treatment Facilities, and Section 09 96 24 — High-Performance Coatings for Water Treatment Facilities, for immersion and severe-service systems.
1.2 SUMMARY
A. This Section includes surface preparation and application of high-performance coating systems on the following general substrate and condition categories:
1. Interior Substrates:
a. New or Previously Uncoated CMU.
b. New or Previously Uncoated Concrete.
c. Existing / Previously Painted CMU and Concrete.
d. Concrete Ceilings – New, Existing Painted or Structural, Plank and Deck.
e. New or Previously Uncoated Steel.
f. Existing / Previously Painted Steel.
g. Glazed Tile / Glazed Block.
h. Miscellaneous Interior Substrates.
2. Exterior Substrates:
a. New or Previously Uncoated CMU and Concrete.
b. Existing / Previously Painted CMU, Brick and Concrete.
c. Stucco and Cement Plaster.
d. New or Full-Coating-Removal Steel.
e. Existing / Previously Painted Steel (Overcoat).
f. Galvanized Steel.
g. Aluminum and Non-Ferrous Metal.
h. Hollow Metal Doors and Frames.
i. Metal Panel Roofs and Walls (Prefinished / Kynar).
j. Wood.
k. Pedestrian Deck Coatings (Non-Vehicular).
l. Water Repellents, Sealers and Anti-Graffiti.
Specifier Note: Retain only the substrate categories and coating systems applicable to the project; delete the rest. See Article 3.8, Coating System Schedule, for complete system descriptions, including surface preparation and coat-by-coat dry film thickness.
1.3 REFERENCES
A. This Section contains references to the governing standards and documents listed below. They are a part of this Section as specified and modified; the current version shall apply unless otherwise noted. In case of conflict between the requirements of this Section and those of the listed documents, the more stringent requirement shall prevail.
B. American Architectural Manufacturers Association (AAMA):
1. AAMA 2604 — Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels.
2. AAMA 2605 — Voluntary Specification, Performance Requirements and Test Procedures for Superior Performing Organic Coatings on Aluminum Extrusions and Panels.
C. ASTM International (ASTM):
1. ASTM D16 — Standard Terminology for Paint, Related Coatings, Materials, and Applications.
2. ASTM D4263 — Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method.
3. ASTM D6386 — Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting.
4. ASTM F1869 — Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride.
5. ASTM F2170 — Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes.
D. International Concrete Repair Institute (ICRI):
1. ICRI Guideline No. 310.2R — Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays; Concrete Surface Profile (CSP) chip/grade scale.
E. NACE International (NACE):
1. NACE No. 2 — Near-White Metal Blast Cleaning (equivalent to SSPC-SP10).
2. NACE No. 3 — Commercial Blast Cleaning (equivalent to SSPC-SP6).
3. NACE No. 6 — Surface Preparation of Concrete (equivalent to SSPC-SP13).
F. SSPC: The Society for Protective Coatings (SSPC):
1. SSPC-SP1 — Solvent Cleaning.
2. SSPC-SP2 — Hand Tool Cleaning.
3. SSPC-SP3 — Power Tool Cleaning.
4. SSPC-SP6 / NACE No. 3 — Commercial Blast Cleaning.
5. SSPC-SP10 / NACE No. 2 — Near-White Metal Blast Cleaning.
6. SSPC-SP11 — Power Tool Cleaning to Bare Metal.
7. SSPC-SP13 / NACE No. 6 — Surface Preparation of Concrete.
8. SSPC-SP16 — Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-Ferrous Metals.
9. SSPC-PA2 — Procedure for Determining Conformance to Dry Coating Thickness Requirements.
G. Environmental Standards:
1. U.S. Green Building Council (USGBC) LEED v4.1, Low-Emitting Materials.
2. California Department of Public Health (CDPH) Standard Method v1.2.
3. Collaborative for High Performance Schools (CHPS) — Paints & Coatings.
4. WELL Building Standard v2, Feature X06, VOC Restrictions.
5. Green Seal GS-11 / GC-03.
H. Unless otherwise specified, references to documents shall mean the documents in effect at the time of receipt of Bids. If a referenced document has been discontinued by the issuing organization, the reference shall mean the last version of the document before it was discontinued, or its designated replacement.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Product Data: Manufacturer's data sheets for each product to be used, including surface preparation instructions and recommendations, storage and handling requirements, installation methods, and safety data sheets (SDS).
C. Shop Drawings: Submit a complete list of products proposed for use, including product names and Series/catalog numbers, arranged in the same format as the Coating System Schedule, with applicable manufacturer's data and recommendations.
D. Selection Samples: For each finish product specified, provide two complete sets of color chips representing the manufacturer's full range of available colors.
E. Verification Samples: For each finish product specified, provide two samples, minimum size 3 x 4 inch, representing actual product, color, sheen, and texture.
F. Manufacturer's Certificates: Provide a letter certifying that products specified meet or exceed the requirements of this Section.
G. LEED Submittals: If the project is a registered LEED project, provide manufacturer's product data for specified coatings, including printed statement of VOC content and emissions, for the applicable Indoor Environmental Quality (EQ) credit.
1.5 QUALITY ASSURANCE
A. Manufacturer's Qualifications: Provide products from a single company specializing in the manufacture of high-performance coatings with a minimum of ten (10) years' experience.
B. Single-Source Responsibility: Prime, intermediate, and finish coat materials shall be products of a single manufacturer, or products standard with and specifically recommended by that manufacturer to ensure compatibility of the system.
C. Applicator's Qualifications: Engage a single installer approved by the manufacturer with a minimum of three (3) years' documented experience in application of protective coatings. Submit name and qualifications, and proof of manufacturer acceptability, to Architect.
D. Regulatory Requirements: Conform to applicable codes and ordinances for flame, fuel, smoke, and volatile organic compound (VOC) rating requirements in effect at the time of application.
E. Mock-Up:
1. Prepare a 10 ft x 10 ft (3.05 m x 3.05 m) mock-up for each coating system specified, using the same materials, tools, equipment, and procedures intended for the Work.
2. Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect.
3. Retain the approved mock-up as the standard by which the completed Work will be judged; refinish the mock-up area as required to produce acceptable work.
F. Pre-Installation Meeting:
1. Schedule a conference and inspection on-site before field application of coating systems begins, attended by Contractor, Owner's representative, Architect, coating applicator, and a representative of the coating manufacturer.
2. Topics to be discussed shall include:
a. Review of Contract Documents and accepted shop drawings; resolve deviations or differences.
b. Environmental conditions, surface conditions, surface preparation, application procedures, and protection following application.
c. Areas available for use as storage and working areas.
3. Prepare and submit a written report of the pre-installation conference to all parties in attendance within three (3) days following the conference.
Specifier Note: Coordinate mock-up locations and pre-installation meeting scheduling with facilities/operations staff — work in occupied buildings typically requires additional coordination for noise, odor, and access restrictions.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver coatings to the site in original, unbroken containers, clearly labeled with coating name, manufacturer, color name and number, batch/lot number, date of manufacture, and mixing/thinning instructions.
B. Store materials in a clean, dry area within the temperature range recommended by the manufacturer; keep containers sealed until ready for use; protect from freezing; do not use materials beyond shelf life.
C. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.
1.7 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by the manufacturer. Do not apply coatings under conditions outside the manufacturer's stated limits.
B. Surface Temperature: Minimum of 5 degrees F (3 degrees C) above the dew point.
C. Do not prepare surfaces or apply coatings in rain, snow, fog, or mist; do not spray coatings when wind velocity exceeds the manufacturer's recommended limit.
D. Provide ventilation during application and cure in confined or enclosed areas in accordance with manufacturer's instructions.
E. Schedule and protect coating work to avoid excessive dust and airborne contaminants during application and curing.
1.8 WARRANTY
Specifier Note: If the project requires a material warranty, retain this Article; otherwise delete.
A. Manufacturer's Warranty: Coating manufacturer shall warrant its products as free from material defects for a minimum period of one (1) year from the date of conditional acceptance. Provide associated warranty certificate.
PART 2 — PRODUCTS
2.1 BASIS OF DESIGN MANUFACTURER
A. Products specified are manufactured by Tnemec Company, Inc., 123 West 23rd Ave, North Kansas City, MO 64116, (816) 483-3400, www.tnemec.com, and are specified as a standard of quality/performance and basis of design. The specified basis of design is intended to provide the longest service life, lowest life cycle cost, and most sustainable solution.
B. Contact: Wally Bates, Atlantic Coating Consultants — atlantic@tnemec.com — 484-644-5303.
C. Materials specified herein shall not preclude consideration of equivalent or superior materials. Submitted equivalent materials or other substitutions shall be submitted to the specifier for consideration in compliance with substitution procedures in Division 01 of the Project Manual and include the following:
1. Requests for substitution shall be provided no later than fourteen (14) days prior to the published bid opening date and must include all required data as listed in these specifications. Substitution requests with incomplete data shall not be reviewed.
2. Requests for substitution shall be made by a plan-holding, licensed, prospective bidder on the project.
3. Requests for substitution shall include actual case histories as evidence of satisfactory past performance in a similar environment with similar estimated service life of the system specified.
4. Substitutions will not be considered that change the generic type or number of coats, or do not meet specified dry film thicknesses.
5. Requests for substitution shall include manufacturer's certified test reports showing the substitute product's full list of performance data for comparison.
6. After the second submittal, Architect/Owner or Owner's Agent hourly rates will be charged to review further submittals.
D. Bidders desiring to use coatings other than those specified shall submit those with their proposal based on the specified materials, and indicate the sum which will be added to or deducted from the base bid should alternate materials be accepted.
2.2 HIGH-PERFORMANCE COATINGS — GENERAL
A. Provide shop and field primers, intermediate coats, and finish coats from a single manufacturer that are compatible with one another and with the substrates indicated, under the conditions of service and application, as demonstrated by the manufacturer based on testing and field experience.
B. Provide secondary materials (thinners, cleaners, patching and filling compounds, reinforcing fabric) that are produced or specifically recommended by the coating system manufacturer to ensure compatibility of the system.
C. Generic coating types, sheen options and NSF/VOC status of each product scheduled herein are listed on the manufacturer's product data sheets; retain product descriptions here only where required by the Owner.
2.3 VOC CONTENT
Specifier Note: VOC limits below reflect the OTC/VOC Rule 2 model rule. Verify current applicable VOC regulations for the project jurisdiction (state or local air quality management district, SCAQMD Rule 1113, the OTC Model Rule, or other) before finalizing this Section, and confirm current VOC content of the specific products selected with Tnemec.
A. Maximum VOC content, by coating category (grams per liter, less water and exempt solvents):
1. Flat Coatings: 50 g/L.
2. Non-Flat Coatings: 100 g/L.
3. Non-Flat High Gloss: 150 g/L.
4. Industrial Maintenance (includes exterior coatings): 250 g/L.
5. Metallic Pigmented (excludes zinc): 500 g/L.
6. Zinc-Rich Primer: 340 g/L.
7. Waterproofing Sealers: 100 g/L.
8. Floor Coatings: 100 g/L.
9. Rust Preventative: 250 g/L.
10. Dry Fog: 150 g/L.
2.4 SHOP-APPLIED SURFACE PREPARATION AND PRIMERS
Specifier Note: Coordinate shop surface preparation and shop primer for steel substrates with Section 05 10 00 Structural Steel, Section 05 50 00 Metal Fabrications, Section 05 70 00 Ornamental Metals, or Section 05 08 00 Factory-Applied Metal Coatings. Delete this Article if all coating systems in the Coating System Schedule are field-applied over field-prepared substrates.
A. Shop Surface Preparation:
1. Exterior Ferrous Metals: SSPC-SP6 / NACE No. 3, Commercial Blast Cleaning.
2. Interior Ferrous Metals: SSPC-SP6 / NACE No. 3, Commercial Blast Cleaning (SSPC-SP2/SP3 minimum for light architectural duty).
3. Exterior and Interior Galvanized Metals: SSPC-SP16, Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-Ferrous Metals.
B. Shop Primer:
1. Interior Ferrous Metals, Light Architectural Duty: Series AK01 Tnemec Shop Primer or Series V10 Tnemec Primer.
2. Interior Ferrous Metals, Moderate and Heavy Duty: Series 1 Omnithane, or Series 90-97 Tneme-Zinc for natatorium and wet environments.
3. Exterior Ferrous Metals: Series 90-97 Tneme-Zinc (or Series 94-H2O Hydro-Zinc, shop-applied).
4. Exterior and Interior Galvanized Metals: Series V69 Hi-Build Epoxoline II.
C. Field coats specified in Article 3.8, Coating System Schedule, shall be compatible with the shop primer indicated above; verify compatibility with Tnemec Technical Services prior to application where a shop primer other than those listed is encountered.
PART 3 — EXECUTION
3.1 EXAMINATION
A. Verify site conditions and substrates under provisions of Division 01.
B. Do not begin installation until substrates have been properly prepared and verified to be within the manufacturer's tolerances. Notify Architect in writing of anticipated problems prior to commencing work.
3.2 PROTECTION
A. Protect surrounding areas, adjacent finishes, and surfaces not scheduled to be coated from damage during surface preparation and application.
B. Immediately remove coatings that fall on surrounding areas and surfaces not scheduled to be coated.
C. In occupied buildings, provide temporary partitions, ventilation, and "Wet Paint" signage as required to maintain safe access and minimize disruption to occupants.
3.3 SURFACE PREPARATION
A. General: Prepare surfaces in accordance with the manufacturer's printed instructions, the surface preparation specified for each system in Article 3.8, Coating System Schedule, and the SSPC/NACE reference descriptions below. Where a conflict occurs, the more stringent requirement shall govern.
B. Steel:
1. Remove visible oil, grease, dirt, dust, mill scale, rust, paint, oxides, corrosion products, and other foreign matter to the degree of cleanliness scheduled for each system.
2. Correct fabrication defects revealed by surface preparation: remove weld spatter and slag, round sharp edges and corners of welds to a smooth contour, smooth weld undercuts and recesses, grind down porous welds to pinhole-free metal, and remove weld flux from the surface.
3. Ensure surfaces are dry. Coat abrasive blast-cleaned surfaces with primer before visible rust forms and within 8 hours of blasting.
4. Shop-Primed Steel: Prepare shop primer to receive the field coat in accordance with manufacturer's instructions; clean and dull-glaze the surface as required for intercoat adhesion.
5. Previously Coated Steel (maintenance): Wash clean; SSPC-SP2/SP3 hand or power tool clean to degloss, remove loose coating and feather transition edges; SSPC-SP11 to bare metal at corroded areas where scheduled.
C. Galvanized Steel and Nonferrous Metal:
1. Prepare per SSPC-SP16 and ASTM D6386, unless otherwise scheduled.
2. Where the system is scheduled as an overcoat over previously coated galvanized steel, wash clean, hand or power tool clean per SSPC-SP2/3 to degloss, remove loose coatings, and feather transition edges as scheduled; SSPC-SP16 at exposed galvanizing.
D. Concrete and Masonry:
1. Ensure surfaces are clean, dry, and free of oil, grease, dirt, dust, laitance, curing compound, and other contaminants.
2. Test concrete for moisture in accordance with ASTM D4263, ASTM F1869 and ASTM F2170.
3. Allow new concrete and mortar to cure a minimum of 28 days (14 days for elastomeric systems scheduled over new concrete/CMU, unless the manufacturer's instructions require longer) before coating.
4. Level protrusions and mortar spatter; fill voids and other defects with a filler or surfacer recommended by the coating manufacturer.
5. Prepare to the surface profile scheduled for each system in accordance with SSPC-SP13/NACE No. 6 and ICRI Guideline No. 310.2R.
6. Repair cracks in accordance with the coating manufacturer's crack-repair procedure prior to coating, as scheduled for the system.
7. Previously Painted Masonry (maintenance): SSPC-SP1; remove chalk and loose paint, patch cracks, spot prime bare areas, and dull glossy surfaces.
E. Stucco and Plaster:
1. Ensure surfaces are clean, dry, and free of oil, grease, dirt, dust, and other contaminants.
2. Allow stucco and plaster to cure and dry a minimum of 14 days before coating. Do not coat over stucco or plaster containing free water, lime, or other soluble alkaline salts.
3. Remove plaster nibs and other protrusions. Patch voids and cracks with approved materials and, after dry, sand flush with the surface.
F. Wood:
1. Ensure surfaces are clean, dry, and free of oil, grease, dirt, dust, surface deposits of sap or pitch, and other contaminants.
2. Seal knots and pitch pockets; sand rough spots with the grain.
3. Fill cracks and holes with an approved filler after the primer is dry; sand flush with the surface when the filler is hard. Lightly sand between coats.
G. Aluminum:
1. Prepare by light abrasive sweep blasting (SSPC-SP16) to a uniform angular profile of 1.0-2.0 mils. Take care not to damage or warp thin-gauge aluminum components during preparation.
H. Glazed Tile and Glazed Block:
1. Clean thoroughly with a degreasing cleaner (Simple Green, TSP, or similar); rinse and allow to dry fully.
2. Uniformly scarify the glazed surface to remove glaze/sheen and provide a mechanical profile for adhesion; perform a test patch to confirm adhesion prior to full-scale preparation.
I. Prefinished Metal Panels:
1. Power wash clean in accordance with SSPC-SP1; uniformly scarify to remove glaze/sheen; perform a test patch to confirm adhesion prior to full-scale preparation.
J. PVC, Plastic and Insulated Pipe Jacketing:
1. Solvent clean and allow to dry; uniformly sand PVC and plastic with fine-grit sandpaper to provide a mechanical profile for adhesion. Clean canvas or PVC pipe jacketing with high-pressure air and solvent of the type recommended by the coating manufacturer.
K. SSPC/NACE Surface Preparation Standards — Reference Descriptions:
1. SSPC-SP1 — Solvent Cleaning: Removes all visible oil, grease, soil, drawing/cutting compounds, and other soluble contaminants by wiping, spraying, immersion, vapor degreasing, alkaline cleaning, or steam cleaning. Does not remove rust, mill scale, or old coating.
2. SSPC-SP2 — Hand Tool Cleaning: Removes loose mill scale, loose rust, and loose paint using non-powered hand tools. Tightly adherent material that passes the dull-putty-knife test may remain.
3. SSPC-SP3 — Power Tool Cleaning: Same intent as SP2 but performed with powered tools. Must not leave burrs, sharp ridges, or gouges in the substrate.
4. SSPC-SP5 / NACE No. 1 — White Metal Blast Cleaning: Abrasive blast to bare metal removing all mill scale, rust, coating, and foreign matter; no staining or residue permitted.
5. SSPC-SP6 / NACE No. 3 — Commercial Blast Cleaning: Abrasive blast to bare metal on at least 66-2/3 percent of each 3 in. x 3 in. area; remaining area may show only light shadows, streaks, or slight discoloration.
6. SSPC-SP7 / NACE No. 4 — Brush-Off Blast Cleaning: Abrasive blast removing loose mill scale, loose rust, and loose coating; tightly adherent material may remain.
7. SSPC-SP10 / NACE No. 2 — Near-White Metal Blast Cleaning: Abrasive blast to bare metal on at least 95 percent of each unit area; remaining 5 percent limited to light shadows, streaks, or discoloration.
8. SSPC-SP11 — Power Tool Cleaning to Bare Metal: Power tool cleaning to bare metal with a minimum 1-mil surface profile; minor rust or staining may remain in pits.
9. SSPC-SP WJ-1 to WJ-4/NACE WJ-1 to WJ-4 — High- and Ultra-High-Pressure Water Jetting: Water jetting to one of four cleanliness grades, WJ-1 through WJ-4. Water jetting alone does not profile the substrate.
10. SSPC-SP13 / NACE No. 6 — Surface Preparation of Concrete: Prepares concrete by mechanical, chemical, or thermal means to remove laitance, curing compound, and contaminants and to achieve a sound, uniform profile; profile depth described using ICRI Concrete Surface Profile (CSP) chips 1-10 per ICRI Guideline 310.2R.
11. SSPC-SP14 / NACE No. 8 — Industrial Blast Cleaning: Abrasive blast to bare metal on at least 90 percent of each unit area.
12. SSPC-SP15 — Commercial Grade Power Tool Cleaning: Power tool cleaning to bare metal with a defined profile; random staining is permitted on no more than 33 percent of each unit area.
13. SSPC-SP16 — Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steel, and Non-Ferrous Metals: Light abrasive blast that removes loose contaminants and lightly profiles the surface without removing all galvanizing or base metal.
14. SSPC-SP17 — Thorough Abrasive Blast Cleaning of Non-Ferrous Metals: More thorough than SP16; removes all loose material while limiting profile depth and base-metal removal.
15. SSPC-SP18 — Thorough Spot and Sweep Blast Cleaning for Industrial Coating Maintenance: Blast cleaning for maintenance recoat work that removes loose material and feathers edges around sound, tightly adherent existing coating.
Specifier Note: SSPC and NACE merged in 2021 to form AMPP (Association for Materials Protection and Performance); the SSPC-SP designations remain the industry-standard reference used throughout this Section and in Tnemec product data sheets. Verify the current revision letter/date with AMPP (ampp.org) before finalizing this Section.
3.4 APPLICATION
A. Apply coatings in accordance with the manufacturer's instructions. Mix and thin coatings, including multi-component materials, per manufacturer's instructions; do not use mixed coatings beyond pot life limits.
B. Keep containers closed when not in use to avoid contamination.
C. Use application equipment, tools, pressure settings, and techniques in accordance with the manufacturer's instructions.
D. Uniformly apply coatings at the spreading rate required to achieve the specified DFT, free of film characteristics or defects that would adversely affect performance or appearance.
E. Stripe paint by brush at critical locations on steel, such as welds, corners, bolts, and edges, using the specified primer.
F. Block Fillers: Apply block fillers to concrete masonry units at a rate to ensure complete coverage with pores filled.
3.5 REPAIR
A. Repair or replace damaged materials and surfaces not scheduled to be coated.
B. Touch-up minor coating damage where the result is not visibly different from adjacent surfaces; recoat the entire surface where touch-up results in a visible difference in sheen, texture, or color.
C. Repair coatings exhibiting film characteristics or defects that would adversely affect performance or appearance in accordance with the manufacturer's instructions.
3.6 FIELD QUALITY CONTROL
A. Verify coatings and other materials are as specified, and that surface preparation and application comply with this Section.
B. Verify DFT of each coat and total DFT of each system using wet film and dry film gauges in accordance with SSPC-PA2.
C. Submit written reports describing inspections made and actions taken to correct non-conforming work; submit copies to Architect and Contractor.
D. Coordinate with the coating manufacturer's technical service department or independent sales representative for current technical data and instructions.
3.7 CLEANING AND PROTECTION
A. Remove temporary coverings and protection of surrounding areas and surfaces upon completion.
B. Protect completed coating systems from damage during subsequent construction activity; touch-up or repair damaged areas prior to Substantial Completion.
C. One-Year Inspection: Owner will set a date for a one-year inspection of coating systems, attended by Owner, Contractor, Architect, and manufacturer's representative. Repair deficiencies as determined by Architect in accordance with the manufacturer's instructions.
3.8 COATING SYSTEM SCHEDULE
Specifier Note: Systems below are organized by substrate group and duty level and cross-referenced to ACC's standard system codes. Retain only the systems required for the project and delete the remainder; where more than one duty level is listed for a substrate, select the level appropriate to the project's abuse/exposure, or retain multiple systems as alternates for Owner selection. Add a bracketed list of typical locations for the project type after each system heading (e.g., "[sally port, holding cell walls]" or "[apparatus bay walls, decontamination rooms]"). Total DFT excludes stripe, touch-up and spot-prime coats and coats applied at coverage rate, as noted.
Interior Coating Systems
A. New or Previously Uncoated CMU (C1)
1. Light Architectural Duty (System C1.1)
a. Surface Preparation: Clean and dry; allow new CMU and mortar to cure a minimum of 28 days; remove efflorescence, loose mortar and dust.
b. Block Filler: Series 130 Envirofill, 60-80 SF/Gal.
c. First Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
d. Finish Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
e. Total DFT: 4.0 - 6.0 (over block filler applied at coverage rate).
2. Moderate Duty, Water Based (System C1.2)
a. Surface Preparation: Clean and dry; allow new CMU and mortar to cure a minimum of 28 days; remove efflorescence, loose mortar and dust.
b. Block Filler: Series 130 Envirofill, 60-80 SF/Gal.
c. First Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
e. Total DFT: 8.0 - 12.0 (over block filler applied at coverage rate).
3. Moderate Duty, Solvent Based (System C1.3)
a. Surface Preparation: Clean and dry; allow new CMU and mortar to cure a minimum of 28 days; remove efflorescence, loose mortar and dust.
b. Block Filler: Series 130 Envirofill, 60-80 SF/Gal.
c. First Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
e. Total DFT: 8.0 - 12.0 (over block filler applied at coverage rate).
4. Moderate/Heavy Duty, Water Based w/ Urethane Finish (System C1.4)
a. Surface Preparation: Clean and dry; allow new CMU and mortar to cure a minimum of 28 days; remove efflorescence, loose mortar and dust.
b. Block Filler: Series 130 Envirofill, 60-80 SF/Gal.
c. First Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 9.0 (over block filler applied at coverage rate).
5. Moderate/Heavy Duty, 100% Solids Epoxy w/ Urethane Finish (System C1.5)
a. Surface Preparation: Clean and dry; allow new CMU and mortar to cure a minimum of 28 days; remove efflorescence, loose mortar and dust.
b. Block Filler: Series 1254 Epoxoblock WB, ~100 SF/Gal (CMU).
c. First Coat: Series 280 Tneme-Glaze, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 9.0 (over block filler applied at coverage rate).
6. Moderate/Heavy Duty, Chemical Resistant (System C1.6)
a. Surface Preparation: Clean and dry; allow new CMU and mortar to cure a minimum of 28 days; remove efflorescence, loose mortar and dust.
b. Block Filler: Series 130 Envirofill, 60-80 SF/Gal.
c. First Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
e. Total DFT: 8.0 - 12.0 (over block filler applied at coverage rate).
7. Heavy Duty / Washdown, 100% Solids Reinforced (System C1.7)
a. Surface Preparation: Clean and dry; allow new CMU and mortar to cure a minimum of 28 days; remove efflorescence, loose mortar and dust.
b. Filler: Series 215 Surfacing Epoxy, 25-40 SF/Gal.
c. Glass Mat: Series 273 ML Stranlok, embedded into wet Series 215.
d. Saturant: Series 280 Tneme-Glaze, DFT 8.0 - 10.0 mils.
e. Intermediate: Series 280 Tneme-Glaze, DFT 6.0 - 8.0 mils.
f. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
g. Total DFT: 16.0 - 21.0 (over surfacer/filler applied as needed — not a rated coat).
B. New or Previously Uncoated Concrete (C2)
1. Light Duty (System C2.1)
a. Surface Preparation: SSPC-SP13/NACE No. 6 Surface Preparation of Concrete; ICRI-CSP 2-3; clean, dry, cured a minimum of 28 days.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
e. Finish Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
f. Total DFT: 4.7 - 7.5 (over surfacer/filler applied as needed — not a rated coat).
2. Moderate Duty, Water Based (System C2.2)
a. Surface Preparation: SSPC-SP13/NACE No. 6 Surface Preparation of Concrete; ICRI-CSP 2-3; clean, dry, cured a minimum of 28 days.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
f. Total DFT: 8.7 - 13.5 (over surfacer/filler applied as needed — not a rated coat).
3. Moderate Duty, Solvent Based (System C2.3)
a. Surface Preparation: SSPC-SP13/NACE No. 6 Surface Preparation of Concrete; ICRI-CSP 2-3; clean, dry, cured a minimum of 28 days.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
f. Total DFT: 8.7 - 13.5 (over surfacer/filler applied as needed — not a rated coat).
4. Moderate/Heavy Duty, Water Based w/ Urethane Finish (System C2.4)
a. Surface Preparation: SSPC-SP13/NACE No. 6 Surface Preparation of Concrete; ICRI-CSP 2-3; clean, dry, cured a minimum of 28 days.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
f. Total DFT: 6.7 - 10.5 (over surfacer/filler applied as needed — not a rated coat).
5. Moderate/Heavy Duty, 100% Solids Epoxy w/ Urethane Finish (System C2.5)
a. Surface Preparation: SSPC-SP13/NACE No. 6 Surface Preparation of Concrete; ICRI-CSP 2-3; clean, dry, cured a minimum of 28 days.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 280 Tneme-Glaze, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
f. Total DFT: 6.7 - 10.5 (over surfacer/filler applied as needed — not a rated coat).
6. Moderate/Heavy Duty, Chemical Resistant (System C2.6)
a. Surface Preparation: SSPC-SP13/NACE No. 6 Surface Preparation of Concrete; ICRI-CSP 2-3; clean, dry, cured a minimum of 28 days.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
f. Total DFT: 8.7 - 13.5 (over surfacer/filler applied as needed — not a rated coat).
C. Existing / Previously Painted CMU and Concrete (C3)
1. Light Duty (System C3.1)
a. Surface Preparation: SSPC-SP1; remove chalk/loose paint, patch cracks, spot prime bare areas, dull glossy surfaces.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
e. Finish Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
f. Total DFT: 4.7 - 7.5 (over surfacer/filler applied as needed — not a rated coat).
2. Moderate Duty, Water Based (System C3.2)
a. Surface Preparation: SSPC-SP1; remove chalk/loose paint, patch cracks, spot prime bare areas, dull glossy surfaces.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
f. Total DFT: 8.7 - 13.5 (over surfacer/filler applied as needed — not a rated coat).
3. Moderate Duty, Solvent Based (System C3.3)
a. Surface Preparation: SSPC-SP1; remove chalk/loose paint, patch cracks, spot prime bare areas, dull glossy surfaces.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
f. Total DFT: 8.7 - 13.5 (over surfacer/filler applied as needed — not a rated coat).
4. Moderate/Heavy Duty, Water Based w/ Urethane Finish (System C3.4)
a. Surface Preparation: SSPC-SP1; remove chalk/loose paint, patch cracks, spot prime bare areas, dull glossy surfaces.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 288/289 Enviro-Pox, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
f. Total DFT: 6.7 - 10.5 (over surfacer/filler applied as needed — not a rated coat).
5. Moderate/Heavy Duty, 100% Solids Epoxy w/ Urethane Finish (System C3.5)
a. Surface Preparation: SSPC-SP1; remove chalk/loose paint, patch cracks, spot prime bare areas, dull glossy surfaces.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 280 Tneme-Glaze, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
f. Total DFT: 6.7 - 10.5 (over surfacer/filler applied as needed — not a rated coat).
6. Moderate/Heavy Duty, Chemical Resistant (System C3.6)
a. Surface Preparation: SSPC-SP1; remove chalk/loose paint, patch cracks, spot prime bare areas, dull glossy surfaces.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
d. First Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
f. Total DFT: 8.7 - 13.5 (over surfacer/filler applied as needed — not a rated coat).
D. Concrete Ceilings – New, Existing Painted or Structural, Plank and Deck (C4)
1. Dry-Fall, High-Moisture / Natatorium Ceilings (System C4.1)
a. Surface Preparation: SSPC-SP13/NACE No. 6; clean and dry; remove loose/peeling coating on previously painted ceilings.
b. Primer: Series 115 Uni-Bond DF, DFT 2.0 - 4.0 mils.
c. Intermediate: Series 115 Uni-Bond DF, DFT 2.0 - 4.0 mils.
d. Finish Coat: Series 115 Uni-Bond DF, DFT 2.0 - 4.0 mils.
e. Total DFT: 6.0 - 12.0 mils.
2. Flexible / Mildew-Resistant Ceilings (Locker Rooms) (System C4.2)
a. Surface Preparation: SSPC-SP13/NACE No. 6; clean and dry; remove loose/peeling coating on previously painted ceilings.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. First Coat: Series 158 Bio-Lastic, DFT 6.0 - 7.0 mils.
d. Finish Coat: Series 158 Bio-Lastic, DFT 6.0 - 7.0 mils.
e. Total DFT: 12.7 - 15.5 mils.
E. New or Previously Uncoated Steel (S1)
1. Light Architectural Duty (System S1.1)
a. Surface Preparation: SSPC-SP1 Solvent Cleaning; SSPC-SP2/SP3 Hand/Power Tool Cleaning minimum (SSPC-SP6 preferred).
b. Primer: Series V10 Tnemec Primer, DFT 2.0 - 3.5 mils.
c. Touch-Up Primer: Series V10 Tnemec Primer, DFT 2.0 - 3.5 mils.
d. First Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
e. Finish Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
f. Total DFT: 6.0 - 9.5 (excludes touch-up coats).
2. Moderate Duty, Solvent Based Epoxy (System S1.2)
a. Surface Preparation: SSPC-SP6/NACE No. 3 Commercial Blast Cleaning.
b. Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
c. Touch-Up Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
d. First Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
f. Total DFT: 10.5 - 15.5 (excludes touch-up coats).
Note: Specify Series 90-97 Tneme-Zinc for natatorium and/or wet environments.
3. Moderate Duty, Solvent Based Epoxy w/ Urethane Finish (System S1.3)
a. Surface Preparation: SSPC-SP6/NACE No. 3 Commercial Blast Cleaning.
b. Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
c. Touch-Up Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
d. First Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
f. Total DFT: 9.5 - 13.5 (excludes touch-up coats).
Note: Specify Series 90-97 Tneme-Zinc for natatorium and/or wet environments.
Note: Use Series 1090 as the finish coat for high traffic areas
4. Heavy Duty, Chemical Resistant Epoxy (System S1.4)
a. Surface Preparation: SSPC-SP10/NACE No. 2 Near-White Metal Blast Cleaning.
b. Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
c. Touch-Up Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
d. Stripe Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
e. First Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
f. Finish Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
g. Total DFT: 10.5 - 15.5 (excludes stripe/touch-up coats).
5. Overhead Structural Steel / Joists / Deck, Dry-Fall (System S1.5)
a. Surface Preparation: SSPC-SP6/NACE No. 3 Commercial Blast Cleaning.
b. Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
c. Touch-Up Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
d. First Coat: Series 115 Uni-Bond DF, DFT 2.0 - 4.0 mils.
e. Finish Coat: Series 115 Uni-Bond DF, DFT 2.0 - 4.0 mils.
f. Total DFT: 6.5 - 11.5 (excludes touch-up coats).
Note: Specify Series 90-97 Tneme-Zinc for natatorium and/or wet environments.
6. Galvanized Steel, Epoxy Finish (System S1.6)
a. Surface Preparation: SSPC-SP1 to remove oil/grease/contaminants; SSPC-SP16 to remove storage stains and uniformly profile.
b. First Coat: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
d. Total DFT: 6.0 - 8.0 mils.
7. Galvanized Steel, Urethane Finish (System S1.7)
a. Surface Preparation: SSPC-SP1 to remove oil/grease/contaminants; SSPC-SP16 to remove storage stains and uniformly profile.
b. First Coat: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
d. Total DFT: 6.0 - 8.0 mils.
8. Galvanized Steel, Light Architectural Duty (System S1.8)
a. Surface Preparation: SSPC-SP1 to remove oil/grease/contaminants; SSPC-SP16 to remove storage stains and uniformly profile.
b. Primer: Series 116 Uni-Bond, DFT 2.0 - 4.0 mils.
c. Finish Coat: Series 1028 Enduratone, DFT 2.0 - 3.0 mils.
d. Total DFT: 4.0 - 7.0 mils.
F. Existing / Previously Painted Steel (S2)
1. Light Architectural Duty (System S2.1)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning to degloss; remove loose coatings; feather transition edges.
b. Spot Primer: Series V10 Tnemec Primer, DFT 2.0 - 3.5 mils.
c. First Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
d. Finish Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 9.5 mils.
2. Moderate Duty, Solvent Based Epoxy Finish (System S2.2)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning to degloss; remove loose coatings; feather transition edges.
b. Spot Prime: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
c. First Coat: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
e. Total DFT: 8.0 - 12.0 (excludes spot-prime coats).
3. Moderate Duty, Solvent Based Epoxy w/ Urethane Finish (System S2.3)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning to degloss; remove loose coatings; feather transition edges.
b. Spot Prime: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
c. First Coat: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
e. Total DFT: 7.0 - 10.0 (excludes spot-prime coats).
Note: Use Series 1090 as the finish coat for high traffic areas
4. Heavy Duty, Chemical Resistant Epoxy (System S2.4)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning; SSPC-SP11 to bare metal at corroded areas; feather transition edges.
b. Touch-Up Primer: Series 1 Omnithane, DFT 2.5 - 3.5 mils.
c. First Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 104 H.S. Epoxy, DFT 4.0 - 6.0 mils.
e. Total DFT: 8.0 - 12.0 (excludes touch-up coats).
5. Overhead Structural Steel / Joists / Deck, Dry-Fall (System S2.5)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning to degloss; remove loose coatings; feather transition edges.
b. Spot Prime: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
c. First Coat: Series 115 Uni-Bond DF, DFT 2.0 - 4.0 mils.
d. Finish Coat: Series 115 Uni-Bond DF, DFT 2.0 - 4.0 mils.
e. Total DFT: 8.0 - 14.0 mils.
6. Galvanized Steel, Epoxy Finish (System S2.6)
a. Surface Preparation: SSPC-SP1; SSPC-SP2/SP3 to degloss and remove loose coating; SSPC-SP16 at exposed galvanizing.
b. First Coat: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
d. Total DFT: 6.0 - 8.0 mils.
7. Galvanized Steel, Urethane Finish (System S2.7)
a. Surface Preparation: SSPC-SP1; SSPC-SP2/SP3 to degloss and remove loose coating; SSPC-SP16 at exposed galvanizing.
b. First Coat: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
d. Total DFT: 6.0 - 8.0 mils.
8. Hollow Metal Doors, Frames, Railings — Light Architectural Duty (System S2.8)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning to degloss; remove loose coatings; feather transition edges.
b. Primer: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
c. Finish Coat: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
d. Total DFT: 4.0 - 6.0 mils.
9. Hollow Metal Doors, Frames, Railings — Moderate/Heavy Duty (System S2.9)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning to degloss; remove loose coatings; feather transition edges.
b. Primer: Series 27 Typoxy, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series 1090 Endura-Shield, DFT 3.0 - 4.0 mils.
d. Total DFT: 6.0 - 8.0 mils.
G. Glazed Tile / Glazed Block (T1)
1. Light/Moderate Duty (System T1.1)
a. Surface Preparation: Clean thoroughly (Simple Green/TSP or similar); uniformly scarify to remove glaze/sheen (test patch recommended).
b. Primer: Series 108 ProBond, DFT 1.0 - 2.0 mils.
c. First Coat: Series 1028 Enduratone, DFT 2.0 - 3.0 mils.
d. Finish Coat: Series 1028 Enduratone, DFT 2.0 - 3.0 mils.
e. Total DFT: 5.0 - 8.0 mils.
2. Moderate/Heavy Duty, Epoxy w/ Urethane Finish (System T1.2)
a. Surface Preparation: Clean thoroughly (Simple Green/TSP or similar); uniformly scarify to remove glaze/sheen (test patch recommended).
b. Primer: Series 108 ProBond, DFT 1.0 - 2.0 mils.
c. First Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
e. Total DFT: 7.0 - 11.0 mils.
3. Shower / Wet Walls (System T1.3)
a. Surface Preparation: Clean thoroughly (Simple Green/TSP or similar); uniformly scarify to remove glaze/sheen (test patch recommended).
b. Primer: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
c. First Coat: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
e. Total DFT: 10.0 - 15.0 mils.
H. Miscellaneous Interior Substrates (M1)
1. Wood — Bare or Previously Painted (System M1.1)
a. Surface Preparation: Clean and dry; sand smooth; remove loose/peeling paint and feather edges.
b. Primer: Series V10 Tnemec Primer, DFT 2.0 - 3.5 mils.
c. First Coat: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
d. Finish Coat: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 9.5 mils.
2. PVC Pipe, Trim and Plastic Components (System M1.2)
a. Surface Preparation: Solvent clean and dry; lightly sand with #150-200 sandpaper.
b. First Coat: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
c. Finish Coat: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
d. Total DFT: 4.0 - 6.0 mils.
3. Insulated Pipe Jacketing (Canvas / PVC Jacket) (System M1.3)
a. Surface Preparation: Clean and dry.
b. First Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
c. Finish Coat: Series 1026 Enduratone, DFT 2.0 - 3.0 mils.
d. Total DFT: 4.0 - 6.0 mils.
4. Interior Aluminum and Non-Ferrous Metal (System M1.4)
a. Surface Preparation: SSPC-SP1; light abrasive sweep blast or uniformly sand to profile; avoid damaging/warping thin components.
b. Primer: Series 116 Uni-Bond, DFT 2.0 - 4.0 mils.
c. Finish Coat: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
d. Total DFT: 4.0 - 7.0 mils.
Exterior Coating Systems
I. New or Previously Uncoated CMU and Concrete (EC1)
1. Elastomeric / Crack-Bridging, Smooth Finish (System EC1.1)
a. Surface Preparation: SSPC-SP13/NACE No. 6; clean, dry, free of oil/grease/form-release agents; allow new concrete/CMU to cure min. 14 days; repair cracks per mfr procedure.
b. Block Filler (CMU, as needed): Series 130 Envirofill, 60-80 SF/Gal.
c. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
d. First Coat: Series 156 Enviro-Crete, DFT 6.0 - 8.0 mils.
e. Finish Coat: Series 156 Enviro-Crete, DFT 6.0 - 8.0 mils.
f. Total DFT: 12.7 - 17.5 (over block filler applied at coverage rate).
2. Elastomeric / Crack-Bridging, Sand Textured Finish (System EC1.2)
a. Surface Preparation: SSPC-SP13/NACE No. 6; clean, dry, free of oil/grease/form-release agents; allow new concrete/CMU to cure min. 14 days; repair cracks per mfr procedure.
b. Block Filler (CMU, as needed): Series 130 Envirofill, 60-80 SF/Gal.
c. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
d. First Coat: Series 156 Enviro-Crete, DFT 6.0 - 8.0 mils.
e. Finish Coat: Series 157 Enviro-Crete (sand textured), DFT 6.0 - 9.0 mils.
f. Total DFT: 12.7 - 18.5 (over block filler applied at coverage rate).
J. Existing / Previously Painted CMU, Brick and Concrete (EC2)
1. Elastomeric / Crack-Bridging Recoat (System EC2.1)
a. Surface Preparation: Power wash; remove loose/peeling coating and chalk; clean and dry.
b. Primer (as needed): Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. First Coat: Series 156 Enviro-Crete, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 156 Enviro-Crete, DFT 4.0 - 6.0 mils.
e. Total DFT: 8.0 - 12.0; optional Primer (as needed) 0.7 - 1.5 mils.
K. Stucco and Cement Plaster (EC3)
1. Uncoated or Previously Painted (System EC3.1)
a. Surface Preparation: SSPC-SP13 Surface Preparation of Concrete; clean and dry.
b. Primer: Series 151-1051 Elasto-Grip FC, DFT 0.7 - 1.5 mils.
c. First Coat: Series 156 Enviro-Crete, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 156 Enviro-Crete, DFT 4.0 - 6.0 mils.
e. Total DFT: 8.7 - 13.5 mils.
L. New or Full-Coating-Removal Steel (ES1)
1. Zinc / Epoxy / Urethane (Good) (System ES1.1)
a. Surface Preparation: SSPC-SP6/NACE No. 3 Commercial Blast Cleaning.
b. Shop or Field Primer: Series 90-97 Tneme-Zinc, DFT 2.5 - 3.5 mils.
c. Touch-Up Primer: Series 90G-1K97 Tneme-Zinc, DFT 2.5 - 3.5 mils.
d. Intermediate: Series V69 Hi-Build Epoxoline II, DFT 4.0 - 6.0 mils.
e. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
f. Total DFT: 9.5 - 13.5 (excludes touch-up coats).
Note: Use Series 1090 as the finish coat for high traffic areas
2. Zinc / Epoxy / Urethane / Fluoropolymer (Best — Extended UV & Color Retention) (System ES1.2)
a. Surface Preparation: SSPC-SP6/NACE No. 3 Commercial Blast Cleaning.
b. Shop or Field Primer: Series 90-97 Tneme-Zinc, DFT 2.5 - 3.5 mils.
c. Touch-Up Primer: Series 90G-1K97 Tneme-Zinc, DFT 2.5 - 3.5 mils.
d. Stripe / Intermediate 1: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 5.0 mils.
e. Intermediate 2: Series 1095 or 1096 Endura-Shield, DFT 3.0 - 4.0 mils.
f. Finish Coat: Series 1070/1071/1072 Fluoronar, DFT 2.0 - 3.0 mils.
g. Total DFT: 10.5 - 15.5 (excludes stripe/touch-up coats).
M. Existing / Previously Painted Steel (Overcoat) (ES2)
1. Epoxy Mastic / Urethane (Good) (System ES2.1)
a. Surface Preparation: SSPC-SP2/SP3 Hand/Power Tool Cleaning; remove loose coating; feather transition edges.
b. Spot Prime: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
c. Full Prime Coat: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
d. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
e. Total DFT: 7.0 - 10.0 (excludes spot-prime coats).
Note: Use Series 1090 as the finish coat for high traffic areas
2. Epoxy Mastic / Urethane / Fluoropolymer (Best) (System ES2.2)
a. Surface Preparation: SSPC-SP2/SP3 Hand/Power Tool Cleaning; remove loose coating; feather transition edges.
b. Spot Prime: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
c. Full Prime Coat: Series 135 Chembuild, DFT 4.0 - 6.0 mils.
d. Intermediate: Series 1095 or 1096 Endura-Shield, DFT 3.0 - 4.0 mils.
e. Finish Coat: Series 1070/1071/1072 Fluoronar, DFT 2.0 - 3.0 mils.
f. Total DFT: 9.0 - 13.0 (excludes spot-prime coats).
N. Galvanized Steel (ES3)
1. New or Full Coating Removal, Urethane Finish (Good) (System ES3.1)
a. Surface Preparation: SSPC-SP1 to remove oil/grease/contaminants; SSPC-SP16 to remove storage stains and uniformly profile.
b. Primer: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
d. Total DFT: 6.0 - 8.0 mils.
2. New or Full Coating Removal, Fluoropolymer Finish (Best) (System ES3.2)
a. Surface Preparation: Remove existing coating; abrasive blast per SSPC-SP16, min. 1.5-mil angular anchor profile.
b. Spot Primer (repair damaged galvanizing): Series 94-H2O Hydro-Zinc, DFT 2.5 - 3.5 mils.
c. Primer: Series V69 Hi-Build Epoxoline II, DFT 3.0 - 4.0 mils.
d. Intermediate: Series 1095 or 1096 Endura-Shield, DFT 2.0 - 3.0 mils.
e. Finish Coat: Series 1070/1071/1072 Fluoronar, DFT 2.0 - 3.0 mils.
f. Total DFT: 7.0 - 10.0 (excludes spot-prime coats).
3. Previously Coated Galvanized, Overcoat (System ES3.3)
a. Surface Preparation: Wash clean; SSPC-SP2/SP3 Hand/Power Tool Cleaning to degloss; remove loose coatings; feather transition edges.
b. Spot / Prime Coat: Series 27 Typoxy, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
d. Optional Finish: Series 1070V Fluoronar, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 8.0; Optional Finish 2.0 - 3.0 mils.
O. Aluminum and Non-Ferrous Metal (ES4)
1. General (System ES4.1)
a. Surface Preparation: Light abrasive sweep blast (SSPC-SP16), uniform angular profile 1.0-2.0 mils; avoid damaging/warping thin components.
b. Primer: Series V69 Hi-Build Epoxoline II, DFT 2.0 - 3.0 mils.
c. Intermediate: Series 1095 Endura-Shield, DFT 2.0 - 3.0 mils.
d. Finish Coat: Series 1071 Fluoronar, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 9.0 mils.
P. Hollow Metal Doors and Frames (ES5)
1. Hollow Metal Doors, Frames, Railings — Light Architectural Duty (System ES5.1)
a. Surface Preparation: SSPC-SP1; SSPC-SP2/SP3 to degloss and remove loose coating; feather transition edges.
b. Primer: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
c. Finish Coat: Series 1028/1029 Enduratone, DFT 2.0 - 3.0 mils.
d. Total DFT: 4.0 - 6.0 mils.
2. Hollow Metal Doors, Frames, Railings — Moderate/Heavy Duty (System ES5.2)
a. Surface Preparation: SSPC-SP1; SSPC-SP2/SP3 to degloss and remove loose coating; feather transition edges.
b. Primer: Series 27 Typoxy, DFT 3.0 - 4.0 mils.
c. Finish Coat: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
d. Total DFT: 6.0 - 8.0 mils.
Note: Use Series 1090 as the finish coat for high traffic areas
Q. Metal Panel Roofs and Walls (Prefinished / Kynar) (ES6)
1. Best — 15-Year Color and Gloss (System ES6.1)
a. Surface Preparation: Power wash clean in accordance with SSPC-SP1; uniformly scarify to remove glaze/sheen (test patch required).
b. Primer: Series 108 ProBond, DFT 1.0 - 2.0 mils.
c. Intermediate: Series 1095 Endura-Shield, DFT 3.0 - 4.0 mils.
d. Finish Coat: Series 1070V Fluoronar, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 9.0 mils.
2. Good — 7-Year Color and Gloss (System ES6.2)
a. Surface Preparation: Power wash clean in accordance with SSPC-SP1; uniformly scarify to remove glaze/sheen (test patch required).
b. Primer: Tex-Cote Metal Prime, DFT 1.0 - 2.0 mils.
c. Intermediate: Tex-Cote Reflect-Tec, DFT 3.0 - 4.0 mils.
d. Finish Coat: Tex-Cote Reflect-Tec, DFT 3.0 - 4.0 mils.
e. Total DFT: 7.0 - 10.0 mils.
R. Wood (EW1)
1. Bare or Previously Painted (System EW1.1)
a. Surface Preparation: Clean and dry; sand smooth.
b. Primer: Series V10 Tnemec Primer, DFT 2.0 - 3.5 mils.
c. First Coat: Series 1028 Enduratone, DFT 2.0 - 3.0 mils.
d. Finish Coat: Series 1028 Enduratone, DFT 2.0 - 3.0 mils.
e. Total DFT: 6.0 - 9.5 mils.
S. Pedestrian Deck Coatings (Non-Vehicular) (ED1)
1. General Waterproofing, Broadcast (System ED1.1)
a. Surface Preparation: SSPC-SP13 Surface Preparation of Concrete.
b. Primer: Series 154 TnemeGuard (thinned), DFT 4.0 - 7.0 mils.
c. Slurry / Broadcast Coat: Series 154 TnemeGuard with 30/50 silica sand, DFT 10.0 - 14.0 mils.
d. Optional Grout Coat: Series 154 TnemeGuard, DFT 10.0 - 14.0 mils.
e. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
f. Total DFT: 16.0 - 24.0; Optional Grout Coat 10.0 - 14.0 mils.
2. Exposed Concrete Stairs and Elevated Decks, Mesh-Reinforced (System ED1.2)
a. Surface Preparation: Wash clean; prepare concrete by sanding, light grinding, or pressurized water cleaning at 4,000-5,000 psi w/ zero-degree oscillating tip; clean, dry, sound. Fill hairline cracks (<1/64") by brushing Series 154 in; cracks ≥1/64" or moving cracks/joints — reinforce w/ Series S211 woven mesh.
b. Steel Spot Prime (as applicable): Series 118 Uni-Bond Mastic, DFT 4.0 - 6.0 mils.
c. Primer: Series 154 TnemeGuard (thinned), DFT 4.0 - 7.0 mils.
d. 1st Intermediate: Series 154 TnemeGuard with S211 woven mesh, DFT 10.0 - 14.0 mils.
e. 2nd Intermediate: Series 154 TnemeGuard with silica sand broadcast, DFT 10.0 - 14.0 mils.
f. Finish Coat: Series 297 Enviro-Glaze, DFT 2.0 - 3.0 mils.
g. Total DFT: 26.0 - 38.0 (excludes spot-prime coats).
T. Water Repellents, Sealers and Anti-Graffiti (ESL1)
1. Penetrating Silane/Siloxane Water Repellent (System ESL1.1)
a. Surface Preparation: Per product surface-absorption test; clean, dry, free of efflorescence.
b. Sealer: Series 633 Prime-A-Pell H2O (Tnemec) — or Tex-Cote Rainstopper 120/140, N/A (penetrating sealer).
c. Total DFT: Not applicable — penetrating sealer, no measurable dry film thickness.
2. Anti-Graffiti (Sacrificial / Non-Sacrificial) (System ESL1.2)
a. Surface Preparation: Clean and dry; if previously coated, uniformly scarify to sound coating.
b. Primer (porous masonry only): Rainstopper 1750W Clear Sealer (TEX-COTE), Applied at coverage rate.
c. Topcoat: Graffiti Gard IV (TEX-COTE), 250-350 SF/Gal clear; 150-200 SF/Gal pigmented.
d. Total DFT: Not specified — system applied by coverage rate; see coat schedule.
Specialty Systems
U. Specialty Systems (X1)
1. Aerogel Thermal-Break Coating at Steel Envelope Penetrations (System X1.1)
a. Surface Preparation: SSPC-SP6/NACE No. 3 Commercial Blast Cleaning.
b. Primer: Series 394 PerimePrime, DFT 2.5 - 3.5 mils.
c. Insulative Coating (2–3 coats by shape): Series 971 Aerolon, 40.0 - 50.0 per coat (2 coats W-shapes / 3 coats HSS & deck).
d. Finish (exposed to view): Series 1028 Enduratone, DFT 2.0 - 3.0 mils.
e. Total DFT: 80 - 150 (per shape; 2 coats W-shapes, 3 coats HSS/deck) plus 2.0 - 3.0 finish where exposed mils.
2. Indoor Pool Liner (System X1.2)
a. Surface Preparation: SSPC-SP13/NACE No. 6, ICRI-CSP 3.
b. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
c. Primer: Series N69F Hi-Build Epoxoline II, 100-150 SF/Gal.
d. Finish Coat: Series N69F Hi-Build Epoxoline II, 250-300 SF/Gal.
e. Lines / Lettering: Series N69F Hi-Build Epoxoline II, 250-300 SF/Gal.
f. Total DFT: Not specified — system applied by coverage rate (SF/Gal); see coat schedule.
3. Outdoor Pool Liner (System X1.3)
a. Surface Preparation: SSPC-SP13/NACE No. 6, ICRI-CSP 3.
b. Filler (as needed): Series 215 Surfacing Epoxy, Applied at coverage rate.
c. Primer: Series N69F Hi-Build Epoxoline II, 100-150 SF/Gal.
d. Intermediate: Series N69F Hi-Build Epoxoline II, 250-300 SF/Gal.
e. Finish Coat: Series V290 CRU, 350-500 SF/Gal.
f. Lines / Lettering: Series V290 CRU, 350-500 SF/Gal.
g. Total DFT: Not specified — system applied by coverage rate (SF/Gal); see coat schedule.
Specifier Note: Specify the Color Schedule here or on the Drawings. Delete this note if not required.